Flood Call 1178

A caller asking for information on the Kenndey Bridge.

Date April 18th 1997, 11:33 pm
Duration 27 seconds
Channel 23
Direction incoming call
Abstract By
Tagged As

Transcript

The following transcript was automatically generated, and has not been reviewed for accuracy. It may contain errors.

Hello, I'm calling from Hillsboro, North Dakota, I work at the beet plant, I've been driving
that way through Grand Forks to get home to Ada, I was wondering if I could make it across
that Kennedy Bridge.
Well at this point the bridge is open, I know they're trying to keep the crossings as minimal
as possible, I don't know how long it's going to be open, okay?
Okay, I'll get it open.
At this point it is.
Okay, thank you.
Alright, yep, bye bye.