- Browse:
- Collections
- Subjects
- Creators
- Record Groups
Garrison Diversion Unit Commission Records
Garrison Diversion Unit Commission Records, August-December 1984
Collection Overview
Title: Garrison Diversion Unit Commission Records, August-December 1984
ID: OGLMC1041
Primary Creator: Garrison Diversion Unit Commission (1984)
Extent: 1.5 Linear Feet
Date Acquired: 00/00/1985
Subjects: Water, Water - Garrison Diversion
Languages: English
Abstract
Scope and Contents of the Materials
Collection Historical Note
The United States Congress authorized the Flood Control Act, later to be known as the Pick-Sloan Missouri Basin Program, on December 22, 1944. The main purpose of Pick-Sloan was to divert water from the Missouri River for flood control, navigation, irrigation, and hydro-electic power. In 1965, the United States Congress authorized construction of the Initial Stage of the Garrison Diversion Unit. This would have irrigated 250,000 acres and provided municipal and industrial water delivery, recreation, fish and wildlife mitigation and enhancement, and flood control in the state of North Dakota. Opposition to the Initial Stage, however, delayed program development.
On August 11, 1984, the Garrison Diversion Unit Commission was appointed by the Secretary of the Interior. The Commission's goals were to review the controversy surrounding the authorized Initial Stage of the Garrison Diversion Unit, to evaluate the contemporary water needs of the state of North Dakota, and to make recommendations.
Public meetings were held in several North Dakota communities from September through December, 1984. The "Commission Plan" was articulated in a final report, dated December 20, 1984. Among the plan's recommendations:
1. "Over 130,000 acres of land be irrigated, none of which would drain into Hudson Bay"
2. $200 million in federal grant monies be set aside to assist municipal, rural, and industrial water service for as many as 130 communities and three Indian reservations
3. A water treatment plant be constructed to treat water which would drain into Hudson Bay by way of the Sheyenne River and the Red River. This would allow for municipal, rural, and industrial water service for communities such as Fargo and Grand Forks
The total cost of the Commission Plan was estimated at $1.12 billion in capital costs, including expenditures to date, along with $15.8 million in annual operation, maintenance, and replacement costs.
The state of North Dakota, as well as the Garrison Diversion Conservancy District, supported reauthorization of the project along the lines indicated by the Commission. The Garrison Diversion Unit Reformulation Act of 1986 was signed into law on May 12, 1986.
Subject/Index Terms
Administrative Information
Repository: Elwyn B. Robinson Department of Special Collections
Access Restrictions: Open for inspection under the rules and regulations of the Elwyn B. Robinson Department of Special Collections.
Acquisition Method: Donation; Acc.#85-1417
Preferred Citation: (Description of Item). Garrison Diversion Unit Commission Records. OGLMC 1041, Box #, Folder #. Elwyn B. Robinson Department of Special Collections, Chester Fritz Library, University of North Dakota.
Finding Aid Revision History: Finding aid migrated to Archon in December 2013.
Box and Folder Listing
Browse by Series:
[Series 1: Reports],
[Series 2: Business Meeting Minutes],
[Series 3: Transcripts of Public Hearings],
[Series 4: Transcripts of Proceedings],
[All]
- Series 3: Transcripts of Public Hearings
- This series consists of the transcripts of public hearings, held in Minot on December 13-14, 1984.
- Box 1
- Folder 9: Public Hearing, Minot, North Dakota: Pages 1-150, December 13, 1984
- Folder 10: Public Hearing, Minot, North Dakota: Pages 151-300, December 13, 1984
- Folder 11: Public Hearing, Minot, North Dakota: Pages 301-430, September 13, 1984
- Folder 12: Public Hearing, Minot, North Dakota: Pages 1-150, December 14, 1984
- Folder 13: Public Hearing, Minot, North Dakota: Pages 151-300, December 14, 1984
- Folder 14: Public Hearing, Minot, North Dakota: Pages 301-475, December 14, 1984
Browse by Series:
[Series 1: Reports],
[Series 2: Business Meeting Minutes],
[Series 3: Transcripts of Public Hearings],
[Series 4: Transcripts of Proceedings],
[All]